PHASE TWO BEGINS

And now for all those fiddly bits! It’s been 2 days since the builders returned to begin phase two of project Nouvelle Cuisine and to be honest I’m more than relieved. I’ve come to loathe microwave dinners, some of which taste less appetising than a bowl of Pedigree Chum. There is more nutritional value in the packaging than in the meals themselves. I really miss not being able to cook proper food.

Installing a kitchen is no easy task. For a desk jockey like me, it looks a logistical nightmare. For starters, there are so many different component parts to co-ordinate. There’s the assembly of the carcasses, wall and floor tiling, worktops, plumbing, gas and electrics, fitting of all the appliances and then a million minor snagging bits and pieces to tidy up once everything else has been done. Watching it all come together over the next week or two will be strangely fascinating.

Our chaps have begun with the right hand side of the kitchen as this is likely to be the easiest part of the installation having less fiddly bits and existing utilities (water and electrics). 
 
Assembling the carcasses

Tuesday – most of the base units and wall hung units have been assembled and positioned according to the detailed plan drawn up by the Wickes kitchen designer. Everything appears to fit where it should although getting the fridge and freezer into the gap at the end of the worktop might be a tight squeeze.

Positioning the base units
Will they all fit in according to the plan?

Wednesday – first length of worktop laid across the base units and hole cut out for the stainless steel sink. A black granite worktop would have been fabulous but in a kitchen the size of mine, would have cost a small fortune so I’ve gone with a smart black laminate one called High Definition Lunar Night. These high definition laminates are hard wearing for the money – just as well as I expect this kitchen to see me well into retirement.

Worktops 3 m long so will need a join on the end
Already the room looks longer

Thursday – tiling has begun. A section of jade metro tiles has been pegged out as a splashback across the wall where the back door once stood. The tiles are a good match for the Soft Fauna painted walls and will look lovely once edged with the gunmetal grey tiling strips.

Tiling between worktop and wall hung cabinets
Jade metro tiles pegged and ready to grout

Hurrah the washing machine has been plumbed in again! No need to pop round to mum’s this weekend for a cup of tea with a basketful of smelly washing. 



Thursday, June 18, 2015

CAT BURGLAR

Look out, it’s the paint inspector! 
 
I think you've missed a bit over there

Word’s obviously got round that Charminster’s own crazy cat lady is re-furbishing the neighbourhood diner and our house has become a moggie magnet for every passing waif and stray. Here’s a photo of the latest feline intruder caught red handed (or should that be red pawed since cats don’t have hands) sneaking into the kitchen whilst we were painting on Tuesday night.

Best take a closer look to make sure

Definitely an opportunist cat burglar if ever I saw one. After a victory lap round the freshly painted kitchen and a few loud miaows, it was promptly escorted off the premises by the Cat Police.

Watered down base coat to cover the plaster
Use old leftover paint but make sure its Matt emulsion
Second coat in Dulux Soft Fauna 4
You'd never know we had the room plastered


First on the Wickes delivery list, my new kitchen turned up promptly at 7.00 am this morning. I was barely out of my PJs before the lorry searching for the blue balloon tied to the front door rumbled round the corner. Twenty minutes later, a cardboard box mountain deposited in the middle of the kitchen ready for next week’s installation to begin. It’s so exciting!

Got it all in the room - just!


Sunday, June 14, 2015

LESS IS MORE

There’s a hole in my bucket, dear Liza, dear Liza. There’s also paint all over my trainers as hours earlier I managed to poke a hole in the bottom of an old tin of paint and found myself submerged in a Dulux mini lake.

Unexpected hole in bottom of old paint tin

Super scrimpers take note. If you decide that it’s OK to use leftover paint to base coat dry plaster, best check there aren’t any rusty holes in the bottom of the tin before you start painting.

Plaster is all nice and dry after almost 2 weeks

Not all walls were re-plastered

Dry plaster is very thirsty. Almost as thirsty as I am as it’s been at least 4 hours since my last cup of tea. Less paint is more effective for base coating dry plaster and our builders recommended a diluted mix of 3 parts paint to 1 part water hence the thinking it might be best to use leftover paint for this first coat.


Working my way round the walls

And now for the fiddly bits 

It has taken all day to key in all the edges and slap a good coat of paint onto the plaster. My intention is to put 3 coats of paint on the walls, a base coat of leftover paint followed by a second coat of the good stuff then a final coat once all the units have been installed. A bit excessive perhaps but this will hopefully cover up any defects from plastering.

After many emails and web investigation, the search for Titanic Verde tiles turned up nothing so I’ve decided to buy the Dakar black/green tiles from Ebay as the closest match to my own floor tiles. Hoping the builders can lay these for me as part of the project.

Kitchen delivery is scheduled for next Thursday and I’ve no idea where any of it is going to go as both the dining room and lounge are now so full you couldn’t swing a cat in them (it’s OK puss, I’m not going to give it a try!).


Tuesday, June 02, 2015

SEARCHING FOR THE TITANIC

I’ve been on the trail of the lonesome tile since last week, chasing down every lead with the tenacity of a Rottweiler. Having tracked down a third party supplier via Topps Tile, I electronically pistol-whipped the poor bloke into confessing they’d originally imported my old Titanic Verde tiles from Spain.

Sample tiles received but only 1 is a close match

Time to put my rusty written Spanish to the test. Will Rocersa (a ceramic company based near Valencia) have a forgotten supply of Titanic tiles gathering dust under a sombrero somewhere? Only time and a good Google translator will tell.

Alas another cul-de-sac in the maze of my investigations but I did manage to get addresses for another 3 UK importers of Titanic Verde tiles. Chances of finding any are now on a par with discovering alien lifeforms working in the Co-op. (Right, so you’ve noticed that weird bloke behind the deli counter with the strange complexion and slightly spindly fingers too …)

Ragged edges where kitchen units used to be

A watched in-box never fills so back to the kitchen to figure out how we can neaten the ragged edges of flooring exposed by removing the old kitchen units. As tracking down matching tiles may not be possible, we’re going with the builders suggestion to create an elongated ‘door mat’ made from hard-wearing coir matting to fill the gap in front of the new French doors.

Straightened with a disc cutter

Anyone attempting to cut tiles that have been cemented onto a concrete floor be warned- this is a very risky business. Most floors once laid are not really designed to be taken up. You can’t just prise up the odd tile here or there. Cracks spread and before you know it, you’ll be pricing up a whole new floor – very expensive. But if you’re really careful and have a good diamond disc cutter, ragged edges can be straightened just enough to give a tidy finish.

Patio area in the daylight

Brick matching almost spot on